Estimate concrete volume, ready-mix yards, or bag count with unit conversion and wastage controls.
Estimate concrete volume, ready-mix yards, or bag count with unit conversion and wastage controls.
Slab volume in cubic feet, then converted to yards for ready-mix or to bags for small jobs.
cubic_feet = length × width × thickness × (1 + wastage%) × (1 + compaction%)cubic_yards = cubic_feet ÷ 27bags = ceil( cubic_feet ÷ cu_ft_per_bag )Ready-mix is sold by the cubic yard, often with a half-yard minimum. Bags suit small jobs, post holes, and patches.
60 lb bags yield ≈ 0.45 cu ft; 80 lb bags ≈ 0.6 cu ft. A cubic yard ≈ 60× 60-lb bags or 45× 80-lb bags; past about 0.5 cu yd, ready-mix wins on price and labour.
Switch to ready-mix once you cross about 0.5 cubic yards. At that point, the bags-vs-truck math favours the truck on price, time, and consistency, and small ready-mix suppliers will deliver as little as a half-yard.
4″ for a typical residential slab, walk, or patio. 5–6″ if vehicles will sit on it. 6″+ with rebar for driveways used by trucks or RVs. Always over a properly compacted granular base.
I default to 10%. Drop to 7% if your forms are tight and the subgrade is dead level, hold at 10% for the typical residential pour, push to 15% on irregular forms or sloping subgrade. Wastage covers over-excavation, sub-base unevenness, and the small thickness variation between forms. Order a touch heavy; running short mid-pour is far worse than throwing a wheelbarrow extra in the back.